Sample document. Aoraki Plumbing & Gas Ltd, the people in it, and every figure on this page are invented, built to show what a real Workflow Review reads like.
← Back to the Workflow Review page Sample deliverable

Inside a Workflow Review: a sample for a Canterbury plumbing firm

This is the shape of what I hand over for the $3,500 Workflow Review: the one process worth automating first, how it runs today, what to build, what it saves and what it costs. Aoraki Plumbing & Gas Ltd is invented, so I can show you a real one without using a client's numbers. A real review opens with a one-page summary, like The decision below, and runs to 5 to 10 pages; this sample is condensed.

4 people Plumbing & gas fitting Rolleston, Selwyn Tradify + Xero

Aoraki Plumbing & Gas Ltd is a four-person plumbing and gas fitting business south-west of Christchurch. Grant owns it and works on the tools alongside two plumbers. Chrissy does the books and office admin twenty hours a week. That is the size and shape of business this review is built for, invented for this sample rather than a real client of mine.

The one process, and why

I looked at four things Aoraki could automate first, scored each on how much time it costs now and how much the fix would disrupt the plumbers' day, and ranked them.

Candidate processTime spent nowVerdict
End-of-job invoicing~13 hrs/weekChosen. One connection between two systems already in use, a short payback, and nothing changes for the plumbers on site.
Supplier invoice reconciliation~6 hrs/weekReal time cost, but three suppliers hand over paper dockets in three different formats. That's a data problem to fix first, not an automation to build first.
Job scheduling and dispatch~4 hrs/weekNot enough time on the table yet, and any fix changes how the plumbers work day to day. More disruption for less return.
Quote follow-up chasing~2 hrs/weekToo small on its own to clear a sensible payback window.

End-of-job invoicing wins on every measure that matters here: it's the biggest time cost on the list, the fix touches only Chrissy's side of the process, and Grant and the two plumbers keep using Tradify exactly as they do now.

How it runs today

StepWhoTime
Log materials and hours against the jobPlumber, on site in TradifyAlready part of the job, no extra minutes
Pull the job into the costing spreadsheet, reconcile supplier docketsChrissy, office10 min
Re-type the line items into Xero to raise the invoiceChrissy, office8 min
Check the invoice against the original quote before it goes outChrissy, office5 min

Twenty-three minutes a job, thirty-four completed jobs a week on average across Grant and his two plumbers, comes to 782 minutes, about 13 hours a week. All of it lands on Chrissy, who is only in the office twenty hours a week to begin with.

What I'd build

One automated flow, built in Power Automate, connecting Tradify to Xero. When a job is marked complete in Tradify, the flow pulls the labour hours and materials, matches them against the original quote, and drafts the Xero invoice with the line items already filled in. If the total sits within 15% of the quote, it's ready for Chrissy to check and send. If it's outside that band, or a required field is missing, it lands in a queue for her to finish by hand instead of guessing at a number.

Tradify Xero Power Automate

What it saves

MetricTodayAfter the build
Jobs a week3434
Minutes a job236 (review and approve the drafted invoice)
Hours a week13.03.4
Hours saved a weekn/a9.6

The six minutes is an assumption, not a measurement: it's what I'd expect a check-and-approve step to take once the draft is already right most of the time. Nine and a half hours back a week is the number that follows from it, and it's Chrissy's time specifically, not a shared pool.

What it costs

Working from the numbers above:

What could go wrong

The decision

Grant is choosing between three things: build now at $4,800 and start recovering the 9.6 hours a week inside about three and a half months, hold off and keep doing it by hand while the business is this size, or spend four weeks confirming the job-count and time-per-job numbers before committing either way. Even a fairly generous miss on those two assumptions still clears the build cost inside two quarters, so the number that moves is the payback window, not whether it's worth doing. That's the decision every Workflow Review ends on: a number to decide against, not a guess.

Want one of these written about your business?

Same structure, your process, your numbers. Two weeks, $3,500, yours to keep.

Christchurch-based. I reply within 1 working day. Or see all three ways to work together →

Sample only: Aoraki Plumbing & Gas Ltd, Grant, Chrissy and every figure above are invented for illustration, not a real client of mine.